Customization: | Available |
---|---|
Additional Capabilities: | Milling |
Application: | Liquid |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Serial No. | Inspection item | Inspection requirement | Actual result |
1 | Empty operating | After assembling, the machine should be work placidly, no abnormal sound, all the pipes and valves should be sealed well, no leakage. While working, the noise should be less than 85db | |
2 | Capability | the capacity should arrive the normal capacityafter the assemble of the gas circuit system, air draft test should be taken, the meter and element should be sensitive and assort with the working procedure.all kinds of pressure container should be tested by the pressure of 1.25 times more than the designed pressure, and no less than 0.1MPa, after test, no leakage should be found. | |
3 | Electric apparatus | Accord with the prescript of GB1497 | |
4 | Appearance | the pipes and valves contact with beverage should apply acid-proof stainless material, accord with the prescript of GB4237, the surface should be burnished, the rugosity should be no more than 1.6um.the sealing material contact with beverage should apply the innoxious sans taste food rubber or something like that.welded seam should be straight, no evident fish tail or concave convex on the stainless steel surface. |